Here is the tentative rate list of our various services. The final rates can be calculated only after site inspection
Pre sale charges for all the services is Rs. 200


(Minimum visiting charges Rs. 200 will be applicable if no work is done after the visit has been made by the technician. In case the service amount is less than Rs 200 than minimum visiting charges will be applicable - only if the service amount is more than the visiting charges, no visiting charges will be added)

Our Pricing

Window Ac

Split Ac

1 Window AC and installation Removal Rs 300 New Plcae.

2 Window AC Gas Filling - 1 Ton Rs 1700Window


3 AC Servicing Rs 350

4 Window AC Servicing (Wet) with normal water Rs 350


Window AC Servicing (Wet) with Pressure Pump Rs 500


6 Window AC Servicing (Wet) with Pressure

Pump Rs 500

7 Window AC Gas Filling - 1.5 Ton Rs1850Window

8 AC Gas Filling - 2 Ton Rs 2100Window AC
Leak Repairs

9 (price decide (After inspection )Window AC Gas Filling - 2 Ton Rs 2100


10 (price decide (After inspection )Window AC Wooden Skirting Only-Without Material(price decide (After inspection )


Split AC Servicing Rs 350 

2 Split AC Servicing (Wet) with normal water (only out door unit) Rs 350

3 Split AC Servicing (Wet) with Pressure Pump (only out door unit) Rs 500

4 Split AC Gas Filling - 1 Ton Rs 1700

5 Split AC Gas Filling - 1.5 Ton Rs 2000

6 Split AC Gas Filling - 2 Ton Rs 2500

7 Split AC Gas Filling - 2.5 Ton Rs 2600

8 Split AC Pipe/Leak Repairs
(After inspection cost will be decided)

STABILIZER

  • AC Stabilizer Installation (only fixing charges) Rs 150
  • AC Stabilizer Repairs
  • (After inspection cost will be decided)

SPLIT AC FITTING 


1 Split Ac standard installation (.75 Tr to 1.5 Tr) with 3 meters copper pipe (copper pipe and insulation customer scope) charges are – Rs1400 

2 Split AC copper pipe rates .75 Tr to 1.5 Tr (copper pipe and insulation) each meter cost is 600 rupees extra.

3 Drain line 60 rupees per meter extra.
Wire flexible 100 rupees per meter extra
Outdoor unit stand 700 rupees extra.

4 Electrical socket installation cost is extra.

( After inspection cost will be decided )